Difference between revisions of "K2"
(head section) |
m (Leiden --> Mifuyu) |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{construction}} | |||
{{Infobox public transit | {{Infobox public transit | ||
| box_width = | | box_width = | ||
| name = Katrakhiva (K2) | | name = Katrakhiva (K2) | ||
| image = | | image = | ||
| alt = | | alt = | ||
| imagesize = 100 | | imagesize = 100 | ||
Line 9: | Line 10: | ||
| alt2 = | | alt2 = | ||
| imagesize2 = | | imagesize2 = | ||
| caption2 = Hal Katrakhiva-V rolling stock | | caption2 = Hal Katrakhiva-V rolling stock just off Natlia Minachi station | ||
| image3 = | | image3 = | ||
| alt3 = | | alt3 = | ||
Line 15: | Line 16: | ||
| caption3 = | | caption3 = | ||
| native_name = <!-- use {{lang}} --> | | native_name = <!-- use {{lang}} --> | ||
| owner = [[ | | owner = [[Hatrigan Lugia]] (Lugid Railway) | ||
| area served = | | area served = | ||
| locale = [[Lugida]], [[Kadya]] | | locale = [[Lugida]], [[Kadya]] | ||
Line 32: | Line 33: | ||
| operation_will_start = | | operation_will_start = | ||
| ended_operation = | | ended_operation = | ||
| operator = | | operator = Hatrigan Lugia | ||
| marks = | | marks = | ||
| host = | | host = | ||
Line 39: | Line 40: | ||
| train_length = | | train_length = | ||
| headway = | | headway = | ||
| system_length = <!-- estimate --> {{convert|2800|km|mi|abbr=on}} | | system_length = <!-- estimate --> {{convert|2800|km|mi|abbr=on}} (main lines) | ||
| track_gauge = 1,320 mm (4 ft 8 1⁄3 in)<br>[[Sharkunen gauge]] | | track_gauge = 1,320 mm (4 ft 8 1⁄3 in)<br>[[Sharkunen gauge]] | ||
| el = 25 kV AC, 60 Hz [[Wikipedia:Overhead line|overhead catenary]] | | el = 25 kV AC, 60 Hz [[Wikipedia:Overhead line|overhead catenary]] | ||
Line 49: | Line 50: | ||
}} | }} | ||
'''Katrakhiva''' ([[Lithian]]: /ˈkatɾaχɪva/ "rapid train") or simply '''K2''' is a network of high-speed railway lines serving [[Lugida]] and [[Kadya]]. It is the flagship train of [[ | '''Katrakhiva''' ([[Lithian]]: /ˈkatɾaχɪva/ "rapid train") or simply '''K2''' is a network of high-speed railway lines serving [[Lugida]] and [[Kadya]]. It is the flagship train of [[Hatrigan Lugia]]. The network was initially built to alleviate traffic congestion between growing [[Natlia]] and [[Eldin]]. Now K2 is marketed as an alternative to flights and a commuter rail network serving largest cities. In addition to the main lines, K2 also operates several spur line and [[Wikipedia:Higher-speed rail|higher-speed rail]] services to serve lower-demand routes such as the Khemon K2 between [[Kirna]] and (city). | ||
Since the opening of its first line, Chagail K2 in 1970, the network has expanded to consist of {{convert|2800|km|mi}} of largely dedicated lines, going as far as [[ | Since the opening of its first line, Chagail K2 in 1970, the network has expanded to consist of {{convert|2800|km|mi}} of largely dedicated lines, going as far as [[Tosed]] and [[Eájed]] in Kadya, with maximum speeds of up to {{convert|350|km/h|mph|abbr=on}}. Several future lines are planned, such as the Kifrit K2 extension from [[Misha]] to Malgint and Nurkaila, and there are further plans to incorporate K2 into Soltenna's [[SISTER|international railway network]]. | ||
==History== | ==History== | ||
By early 1960s the post-war economic miracle brought large numbers of people to the rapidly growing Natlia-Eldin corridor (Midan metropolitan area). Ridership on the Khere Main Line, the region's fastest reserved seat service at the time, and other lines serving the corridor rose rapidly. In response Hatrigan Lugia began removing level crossings still present along the line to increase its capacity and introduced a limited express service called Khere Rapid. With the approaching prospect of the track reaching capacity, the Ministry of Transport in 1964 began looking for construction of a new railway serving the region. | |||
===Early plans=== | ===Early plans=== | ||
Line 76: | Line 78: | ||
[[Category:Transport in Lugida]] | [[Category:Transport in Lugida]] | ||
[[Category:Transport by rail]] | |||
[[Category:Works by Mifuyu]] |
Latest revision as of 17:00, 25 June 2023
This article or section is undergoing expansion or major restructuring. You are welcome to assist in its construction by editing it as well.
This article was last edited by Mifuyu (talk | contribs) 9 months ago. (Update) |
Hal Katrakhiva-V rolling stock just off Natlia Minachi station | |
Overview | |
---|---|
Owner | Hatrigan Lugia (Lugid Railway) |
Locale | Lugida, Kadya |
Transit type | High-speed rail |
Number of lines | See list of lines |
Operation | |
Began operation | 1970 |
Operator(s) | Hatrigan Lugia |
Technical | |
System length | 2,800 km (1,700 mi) (main lines) |
Track gauge | 1,320 mm (4 ft 8 1⁄3 in) Sharkunen gauge |
Electrification | 25 kV AC, 60 Hz overhead catenary |
Top speed | 350 km/h (220 mph) |
Katrakhiva (Lithian: /ˈkatɾaχɪva/ "rapid train") or simply K2 is a network of high-speed railway lines serving Lugida and Kadya. It is the flagship train of Hatrigan Lugia. The network was initially built to alleviate traffic congestion between growing Natlia and Eldin. Now K2 is marketed as an alternative to flights and a commuter rail network serving largest cities. In addition to the main lines, K2 also operates several spur line and higher-speed rail services to serve lower-demand routes such as the Khemon K2 between Kirna and (city).
Since the opening of its first line, Chagail K2 in 1970, the network has expanded to consist of 2,800 kilometres (1,700 mi) of largely dedicated lines, going as far as Tosed and Eájed in Kadya, with maximum speeds of up to 350 km/h (220 mph). Several future lines are planned, such as the Kifrit K2 extension from Misha to Malgint and Nurkaila, and there are further plans to incorporate K2 into Soltenna's international railway network.
History
By early 1960s the post-war economic miracle brought large numbers of people to the rapidly growing Natlia-Eldin corridor (Midan metropolitan area). Ridership on the Khere Main Line, the region's fastest reserved seat service at the time, and other lines serving the corridor rose rapidly. In response Hatrigan Lugia began removing level crossings still present along the line to increase its capacity and introduced a limited express service called Khere Rapid. With the approaching prospect of the track reaching capacity, the Ministry of Transport in 1964 began looking for construction of a new railway serving the region.